CHECK-IN
SCANNING QR CODE
Hold steady · within 50m of site
Check-in Confirmed
Worker: James Carter · KA-2847
Time: 07:34 AM
Site: Résidence Les Pins
Distance: 11m ✓
Notification sent to James
Foreman Mike also checked in (first scan of day)
Foreman · Résidence Les Pins
Mike Harris
Thursday, May 14 · 08:15 AM
Scan QR — Check-in Worker
Tap to scan · GPS active · 50m radius
6/8
1
2
3
Next: Scan 3 — Return from break
Foreman is responsible for all workers on site. Any unregistered worker or undeclared departure is the foreman's responsibility.
Scan Check-out
Safety Check
6
Present
1
Absent
1
Late
34h
Hours
Said Rabhi not checked in · Alert auto-sent to site manager
08:00
My Crew Today
James Carter
Ground floor reinforcement
7h30
✓ Present
David Bah
Level 1 formwork
7h00
✓ Present
Yusuf Diallo
Masonry zone C
7h15
✓ Present
Sothy Phan
Scaffolding level 2
7h00
✓ Present
David Rossi
Late · Alert sent to manager
6h45
⏱ Late
Ratha Sok
Checked out · 08:00 → 16:00
8h00
✓ Out
Said Rabhi
Not checked in · Manager notified
✗ Absent
Leave Requests — Pending Your Approval
Annual Leave Request
Pending
James Carter · KA-2847
May 20 → May 22 (3 days) · Requested May 14 ✓ 6 days notice
Next public holiday: Water Festival (Bon Om Touk)
Nov 10–12, 2026 · Cambodia National Holiday · All sites closed
Concrete 30m³ — Lafarge
Tap to open delivery checklist →
14:00
Crew
Safety
Delivery
Equipment
Report
Morning Safety Check
Thursday, May 14
Complete before work starts · Send to site manager
PPE Check — Per Worker
Worker
KA
James Carter
MB
David Bah
YD
Yusuf Diallo
SP
Sothy Phan
Site Perimeter
Fencing complete
All perimeter panels in place
Signage visible
Warning signs + no entry boards
⚠️
Site access controlled
Entry point manned or locked
Fall protection in place
Edges + openings guarded — level 2+
🪜
Equipment Pre-use Check
Concrete mixer — checked
Guards in place · No leaks
Tower crane — operator certified
Log book signed · Pre-shift check done
First aid kit accessible
Location known to all workers
🩹
Emergency exit clear
No obstruction on escape routes
Flag a safety issue → Immediate alert to site manager
Send Safety Check to John Smith
Crew
Safety
Delivery
Equipment
Report
Delivery Check
Concrete 30m³ · Lafarge
ETA: 14:00
Order #BC-2847
Items to Check
Concrete C25/30
Ordered: 30m³ · Check ticket quantity
Delivery note signed
Driver signature + company stamp
Slump test done
Quality test on arrival · Photo required
Delivery area clear
Truck access verified · No obstruction
No visible defects
Color / consistency / no contamination
Photos Required
Ticket
Delivery
Quality
Signature
Add
Discrepancy?
Discrepancy alert sent to site manager')">
Flag discrepancy → Immediate red alert to John Smith
Validate Delivery → Send to Manager
Crew
Safety
Delivery
Equipment
Report
Equipment · Résidence Les Pins
Site Equipment
Track tools, machinery & stock
Machinery
Concrete Mixer
Ref: BM-04 · On site since Monday
✓ OK
Tower Crane TC-48
Operator: R. Petit · Certified
✓ OK
Excavator CAT 320
⚠️ Hydraulic issue — check required
⚠️ Check
Tools & Materials
Rebar HA16
Stock: 2 bundles remaining — low
Low stock
🪵
Formwork Panels
48 panels · All accounted for
✓ OK
Safety Harnesses
6 present · 2 missing
2 Missing
Concrete Vibrator
Ref: CV-02 · Charged
✓ OK
Request Material → Send to Site Manager
Request Material
Category
Rebar
Concrete
Electrical
Plumbing
PPE
Steel
Other
Material
JIS SD390 D16 / T16 BS4449 / HRB400 Ø16 — 6m or 12m
Specification / Gabarit
Quantity
Tomorrow
This week
Urgent today
Additional note
Specification
Send Request to John Smith
Crew
Safety
Delivery
Equipment
Report
End of Day Report
Mike Harris · Foreman
Thu May 14 → John Smith · Site Manager
Crew & Hours
All workers checked out (6/8 present today)
1 absent (Said Rabhi) — notified manager at 08:00
1 late (David Rossi) — arrived 08:15, alert sent
Overtime worked today — specify hours in comments
Work Progress
Ground floor slab pour — completed
Level 1 formwork — in progress (approx 60%)
Zone C masonry — delayed (heavy rain this afternoon)
Site cleanup done — all areas clear for tomorrow
Safety
Morning PPE check passed — all present workers
No accidents or injuries today
Safety incident to report — see comments
David Bah missing boots — noted, corrected by 08:30
Deliveries
Concrete delivery received and validated
Delivery note signed and photographed
No discrepancies — full 30m³ received
Needs for Tomorrow
Extra rebar HA16 needed — request sent (5 bundles)
Replace 2 missing safety harnesses
Excavator hydraulic check — mechanic required
Additional worker needed if Said Rabhi still absent
Comments & Observations
Photos Today
Add
Add
Add
Send Report to John Smith
Site Manager · Résidence Les Pins
Crew
Safety
Delivery
Equipment
Report
Send EOD Report?
This will be sent to John Smith (Site Manager) and cannot be edited after sending.
Date
Sections
Photos
Offline Mode — Degraded Pointage
Manual attendance · requires double validation
No network · Time locked to device clock · Cannot be modified
Degraded mode — double validation required
Requires validation from Site Manager and Foreman. Time is locked to device clock.
Recording time
--:--
Mark attendance — Résidence Les Pins
KA
James Carter
KA-2847
Present
Absent
SR
Said Rabhi
SR-1193
Present
Absent
DR
David Rossi
DR-0891
Present
Absent
Proof photo — mandatory
Take team photo now
Timestamped automatically · Cannot be skipped
Crew
Safety
Delivery
Offline
Report
Add OPUS to your home screen
Install OPUS for quick access — works like a real app, opens faster and stays available even when Telegram is slow.
OFFLINE
My Requests