CHECK-IN
⬛
SCANNING QR CODE
Hold steady · within 50m of site
✕ Cancel
Check-in Confirmed
Worker:
James Carter · KA-2847
Time:
07:34 AM
Site:
Résidence Les Pins
Distance:
11m ✓
Notification sent to James
Foreman Mike also checked in (first scan of day)
Foreman · Résidence Les Pins
Mike Harris
Thursday, May 14 · 08:15 AM
Scan QR — Check-in Worker
Tap to scan · GPS active · 50m radius
6/8
1
2
3
4
Next: Scan 3 — Return from break
Foreman is responsible for all workers on site. Any unregistered worker or undeclared departure is the foreman's responsibility.
Scan Check-out
Safety Check
6
Present
1
Absent
1
Late
34h
Hours
Said Rabhi not checked in · Alert auto-sent to site manager
08:00
My Crew Today
KA
James Carter
Ground floor reinforcement
7h30
✓ Present
MB
David Bah
Level 1 formwork
7h00
✓ Present
YD
Yusuf Diallo
Masonry zone C
7h15
✓ Present
SP
Sothy Phan
Scaffolding level 2
7h00
✓ Present
DR
David Rossi
Late · Alert sent to manager
6h45
⏱ Late
RS
Ratha Sok
Checked out · 08:00 → 16:00
8h00
✓ Out
SR
Said Rabhi
Not checked in · Manager notified
—
✗ Absent
Leave Requests — Pending Your Approval
Annual Leave Request
Pending
James Carter · KA-2847
May 20 → May 22 (3 days) · Requested May 14 ✓ 6 days notice
✓ Approve
Reject
Next public holiday: Water Festival (Bon Om Touk)
Nov 10–12, 2026 · Cambodia National Holiday · All sites closed
Concrete 30m³ — Lafarge
Tap to open delivery checklist →
14:00
Crew
Safety
Delivery
Equipment
Report
Morning Safety Check
Thursday, May 14
Complete before work starts · Send to site manager
PPE Check — Per Worker
Worker
KA
James Carter
✓
✓
✓
✓
MB
David Bah
✓
✓
✓
YD
Yusuf Diallo
✓
✓
✓
✓
SP
Sothy Phan
✓
✓
✓
Site Perimeter
✓
Fencing complete
All perimeter panels in place
✓
Signage visible
Warning signs + no entry boards
⚠️
✓
Site access controlled
Entry point manned or locked
Fall protection in place
Edges + openings guarded — level 2+
🪜
Equipment Pre-use Check
✓
Concrete mixer — checked
Guards in place · No leaks
Tower crane — operator certified
Log book signed · Pre-shift check done
✓
First aid kit accessible
Location known to all workers
🩹
✓
Emergency exit clear
No obstruction on escape routes
Flag a safety issue → Immediate alert to site manager
→
Send Safety Check to John Smith
→
Crew
Safety
Delivery
Equipment
Report
Delivery Check
Concrete 30m³ · Lafarge
ETA: 14:00
Order #BC-2847
Items to Check
Concrete C25/30
Ordered: 30m³ · Check ticket quantity
Delivery note signed
Driver signature + company stamp
Slump test done
Quality test on arrival · Photo required
Delivery area clear
Truck access verified · No obstruction
No visible defects
Color / consistency / no contamination
Photos Required
Ticket
Delivery
Quality
Signature
Add
Discrepancy?
Discrepancy alert sent to site manager')">
Flag discrepancy → Immediate red alert to John Smith
Validate Delivery → Send to Manager
→
Crew
Safety
Delivery
Equipment
Report
Equipment · Résidence Les Pins
Site Equipment
Track tools, machinery & stock
Machinery
Concrete Mixer
Ref: BM-04 · On site since Monday
✓ OK
Tower Crane TC-48
Operator: R. Petit · Certified
✓ OK
Excavator CAT 320
⚠️ Hydraulic issue — check required
⚠️ Check
Tools & Materials
Rebar HA16
Stock: 2 bundles remaining — low
Low stock
🪵
Formwork Panels
48 panels · All accounted for
✓ OK
Safety Harnesses
6 present · 2 missing
2 Missing
⚡
Concrete Vibrator
Ref: CV-02 · Charged
✓ OK
Request Material → Send to Site Manager
Request Material
✕
Category
Rebar
Concrete
Electrical
Plumbing
PPE
Steel
Other
Material
JIS SD390 D16 / T16 BS4449 / HRB400 Ø16 — 6m or 12m
Specification / Gabarit
Quantity
Tonnes (T)
m³
metres (m)
units
bags
sheets
rolls
Tomorrow
This week
Urgent today
Additional note
Specification
Send Request to John Smith
→
Crew
Safety
Delivery
Equipment
Report
End of Day Report
Mike Harris · Foreman
Thu May 14 → John Smith · Site Manager
Crew & Hours
✓
All workers checked out (6/8 present today)
✓
1 absent (Said Rabhi) — notified manager at 08:00
✓
1 late (David Rossi) — arrived 08:15, alert sent
Overtime worked today — specify hours in comments
Work Progress
✓
Ground floor slab pour — completed
✓
Level 1 formwork — in progress (approx 60%)
Zone C masonry — delayed (heavy rain this afternoon)
✓
Site cleanup done — all areas clear for tomorrow
Safety
✓
Morning PPE check passed — all present workers
✓
No accidents or injuries today
Safety incident to report — see comments
✓
David Bah missing boots — noted, corrected by 08:30
Deliveries
Concrete delivery received and validated
Delivery note signed and photographed
No discrepancies — full 30m³ received
Needs for Tomorrow
✓
Extra rebar HA16 needed — request sent (5 bundles)
✓
Replace 2 missing safety harnesses
✓
Excavator hydraulic check — mechanic required
Additional worker needed if Said Rabhi still absent
Comments & Observations
Photos Today
Add
Add
Add
Send Report to John Smith
Site Manager · Résidence Les Pins
→
Crew
Safety
Delivery
Equipment
Report
Send EOD Report?
This will be sent to John Smith (Site Manager) and cannot be edited after sending.
Date
—
Sections
—
Photos
—
Review again
Send report →
Tomorrow's QR codes sent at noon
Check your bot messages — QR codes available offline in Telegram history
Offline Mode — Degraded Pointage
Manual attendance · requires double validation
No network · Time locked to device clock · Cannot be modified
Degraded mode — double validation required
Requires validation from Site Manager and Foreman. Time is locked to device clock.
Recording time
--:--
Mark attendance — Résidence Les Pins
KA
James Carter
KA-2847
Present
Absent
SR
Said Rabhi
SR-1193
Present
Absent
DR
David Rossi
DR-0891
Present
Absent
Proof photo — mandatory
Take team photo now
Timestamped automatically · Cannot be skipped
Submit for validation
Crew
Safety
Delivery
Offline
Report
Add OPUS to your home screen
Install OPUS for quick access — works like a real app, opens faster and stays available even when Telegram is slow.
1
Tap the
Share
button
at the bottom of your browser
2
Scroll down and tap
"Add to Home Screen"
3
Tap
Add
— OPUS icon appears on your home screen
↓
1
Tap
"Add to Home Screen"
in the prompt below
2
Confirm by tapping
Add
3
OPUS icon appears on your home screen — open it anytime
↓
Add to Home Screen
Not now
OFFLINE